Bellaire High School
PROJECT SIZE
749,353 SF
CONCRETE
19,629 CY
REBAR
1,766,585 LBS
PROJECT DETAILS
Greco Structures was selected to help build the new 3,200-student Bellaire High School in Houston. The project includes a 324,456-square-foot building; a four-story, 268,366-square-foot garage; and 76,191 square feet of site work. Greco is working closely with the general contractor on this project to help minimize disruption to the school as the faculty and student body transition into the new building halfway through the project.
PROJECT OWNER
LOCATION
CHECK ALL